About Comments

Comments are enabled on all postings. Click a posting to find the comment box. Comments are moderated and appear after my review.
Showing posts with label Project16. Show all posts
Showing posts with label Project16. Show all posts

Friday, 21 October 2016

Project 16 - Project Finished

I end this series where I started - with a track plan. Not a speculative sketch as in Part 1 but a satellite image of the completed layout.

The build has taken about 10 months work comprising a few hours hobby time per week. Baseboards, most buildings and trees are reused from the previous layout. If they had to be made from scratch it would have added another couple of months to the project.
(click image to enlarge it)

Now I need to run trains in earnest to get used to the new track layout, especially shunting operations.

Some loose ends to tidy up. I want to remake a couple of videos to replace those filmed on the previous layout and my main website will be overhauled to reflect this rebuild. I also want to go through all Blog postings and remove out dated ones.

After that I have new model railway projects in mind, which will undoubtedly appear on this Blog, if they take off.

Feel free to comment on any of the postings in this series.

Postscript

Just to show that a layout is never really finished this is a Calf Float that I subsequently knocked up. My own designed 3D printed kit with printed paper overlays.

Calf Floats were used to convey calves and small animals between the cattle dock pens and rail wagons.

A preserved example is on display in the Train Story museum on the Isle of Wight.

To Project 16 Part 1.

Friday, 14 October 2016

Project 16 - Crewkerne Tunnel Pt. 3 Fin.

This is the view down from the top of the tunnelled  hill. 



The completed tunnel portal is shown below.

Note: The normal viewpoint is from the right hand side, where the portal is mostly hidden by the embankment.

The best way to peruse this scene is through the mirrored wall at the back of the station layout, which also gives the only view available to us along Clark's Lane. The foreground track work is also seen (out of shot here) making this the deepest landscaped view across the layout of about 5 feet.

Below I have flipped the image to show how it should be seen if I squeezed myself  into the 30cm gap between the station layout and the mirrored wall.

To Part 44.

To Series Part 1.

Friday, 7 October 2016

Project 16 - Crewkerne Tunnel Pt. 2

One of my pet hates is modelled tunnels where the hill top is just a tad higher than the tunnel mouth and to make matters worse a town is built on top! It's just not authentic.

At Crewkerne tunnel the hill is tall, steep and unpopulated. On my model the hill (A) is cut down but still tall, taller than looks from this angle, and the top is left open because it is above normal viewing eye level.

A removable side panel for access (D) is held in place with one magnetic latch.

This view shows the depth of the interior walls (C). It is not the normal viewing angle, which is between B and D, and with the embankment (B) now in place there is even less scope to view the portal, let alone inside it.

The embankments are my usual build method of polystyrene foam blocks covered in Plaster of Paris bandage. The surface is then smoothed over using Wickes wood filler.

Just showing on the far right is the side wall of the other portal on the Hewish Gates side of the layout.

To Part 43.

To Series Part 1.

Wednesday, 28 September 2016

Project 16 - Crewkerne Tunnel Pt. 1

Visitors to my main website may have seen there the portal of Crewkerne Tunnel that is built into my Hewish Gates layout. Now I am creating the other end on what was previously the non-scenic bridging baseboard between the two layouts.

I can not be sure the portal architecture and construction is accurate to prototype from old monochrome photographs I have seen. When I built the portal on Hewish Gates it seemed to me that the portal was stone work with brick capping. Subsequently I saw a glimpse of one portal in the Clemens colour film 'The Withered Arm'  (incorrectly identified by the film narrator as Hewish tunnel). That portal is clearly brick construction with a rough stone arch. That is what I have modelled here on the approach to Misterton Station.

The portal is made from plywood covered in old English brick bond paper that I created on the computer, taking care to include the white mineral leeching from the brick, as the prototype.

The stone arch is Miliput standard grade epoxy putty. I have a love/hate relationship with this product. I find that the initial adhesion is weak but once set hard (after several hours) stays firmly in place. During application excess can be scraped off the brick paper without any marks or damage due to the putty not being wet, like clay products.

The track work through the model tunnel is on a curve. It is not necessary to make a complex tunnel interior that follows the curve because the viewing angle for the portal is quite acute, as seen in the first photo.

The tunnel interior is built at right angles to the portal, which makes for a simple construction, and the part where interference with trains arises is cut away.

This is exactly what I did for the other portal. From the normal viewing position you would never see that it is not a full fabrication.

Landscape is to be created above this and the side will be a removable panel for access.

The first and third photo show part of the back scene I created from photographing a real location, printing out on multiple A4 sheets and sticking together on a hardboard backing.

The back scene is reused from the previous incarnation of this layout where it formed a front scene on this non-scenic bridging baseboard, which is now being landscaped. It has added another dimension to the model giving an impression of more depth than actually exists on the layout.


To Part 41.

To Series Part 1.

Friday, 23 September 2016

Project 16 - Return to Cattle Dock

'Followers' may recall I had an issue sourcing 00 gauge calves for the cattle dock pens. Well, I found some that are about the right height for 6 month old fresian male calves. Purchased from Pendukemodels (at a show) I believe they are the same as that manufactured by Dorspring. Pendukemodels supplied me one cow and two calves in a pack. The problem is the calves have the same pose of head down grazing. A herd of these in a cattle pen would not be suitable so, I looked into moulding replicas and adapting them for an upright head posture.

Searching YouTube tutorials on 'moulding miniatures' I came across this one. I adopted that technique simply because I had all the required materials to hand. I find it is a very effective method of replicating small 4 legged critters and at mininal cost.

Photograph on the right is two halves of the mould tool made from a hot glue stick with a moulded calf in situ.


Photo left shows the stages of adaptation. Left to right is the master Pendukemodels calf, then the moulded replica, then repositioned head on milliput standard putty neck and finally the painted model.

The hot glue stick mould tool captures the fine details of the master but care is needed. The calf head in particular is not so well defined as the master having lost much of the ear profile. More care would probably have overcome this but the final result here is OK for me - they are quite small being about 11mm high so deficiences are not too noticeable.

Below is the scene on the model railway. The mould tool is good for creating more calves so I could go mad and fill both pens if I wanted to.This will do for now.

-------------------------------
To Part 40.

To Part 1.







Friday, 16 September 2016

Project 16 - More Ballasting

This round of track ballasting takes us to the end of the buffer stops. I ran out of builders decorative granite chips so this was substituted with Woodland Scenics medium grey granules, which has two shades of grey. Included in my mix is brown cork granules and for areas between the sleepers coal granules to represent dirty ballast. To the mix is added dry wallpaper paste granules for adhesion. The mix is spread between the sleepers and the lot sprayed with water containing a few drops of washing up liquid to reduce surface tension.


Left to Right: down head shunt, down main, up main, up head shunt.

Next up is the final push for this project as I create the approach to Crewkerne Tunnel and its portal.


To Part 39.

To Part 1.

Saturday, 10 September 2016

Project 16 - East Field Pt. 4 Fin.

And so to East Field itself. The field is populated with horses, which is inspired from the area where I live as there are half a dozen fields round about occupied by horses from the local livery stable and riding school.


Unfortunately all but one of the model horses (made in Hong Kong) have the same pose. I tried to differentiate through colour and position so that it is not obvious. There are dark bays, chestnut, grey/white and a palomino in there.

This end of the field is open and the far end has a clump of trees midway between the hedges.

The hedge in the right foreground is somewhat lower than that alongside Clark's lane and is kept nicely trimmed by the railway because it is alongside the crane yard. Further along, where the yard peters out, the hedge has been allowed to go wild with distinctive shrubs commanding the ground.

The field is made from two shades of static grass.

The hedge construction is described here.

The large trees are sprigs of Yarrow glued together.

Small trees/shrubs are mainly Woodland Scenics armatures and matting spread over. When I ran out I made some myself surprising quickly from 7 pieces of twisted wire in two tiers with Woodland Scenics matting spread over.

Since these photos were snapped a back scene has been installed - more on that later.


To Part 38.

To Series Part 1.

Sunday, 4 September 2016

Project 16 - East Field Part 3

In front of Station Cottage is Clark's Lane. In reality, and on this side of the railway, it is a green lane between two fields with high hedges but no buildings alongside. I have upgraded it to a tarmacadam lane to serve the cottage and field. But it gets little use, indicated by the spoil of gravel and dirt washed from the verge by rain. Vehicle movement to the cottage and field have driven a path through this.

The width of the tarmacadam was determined from me pacing a real lane and when I got home measured my boot multiplied by the number of steps. It calculated to nine and a half feet.


Beyond the cottage, with even less vehicle use of the road, grass has started to invade the road surface.


With high hedges little of the cottage environs are visible. The field gate serves as a portal to catch a glimpse of it.
The field is to be used by grazing horses and their hooves have churned up the ground at the gate leaving it peppered with hoof impressions. Some of the soil has spilled onto the road surface.

To photograph the views down either end of the road proved very difficult due to limited access on the layout here. My compact camera could not cope with the close proximity to the model and the long depth of field required. I borrowed a Go-Pro Hero 4 miniature camera for the shots, which did the job admirably.


To Part 37.

To Series Part 1.

Friday, 26 August 2016

Project 16 - East Field Part 2

Squeezed into the corner of the baseboard is station cottage, a Wills Finecast plastic kit I built in the late 1980s.

Photo. 1, Station Cottage (with photo stitched back scene)

On the left is a wooded enclosure (Woodland Scenics small trees, shrubs and homemade large tree comprised of dead Yarrow sprigs).

The cottage fronts onto Clark's Lane and East Field (yet to be modelled).


Photo. 2, Dusk at Station Cottage (with photo stitched back scene)

The rustic hedge is my first attempt using a method that I saw in a YouTube video tutorial recently. Hitherto I used green scourer pad covered in Woodland Scenics matting. That's fine except it can look a bit too uniform. I wanted a hedge that was more rustic, as seen alongside little-used country lanes.

It is simply coir hanging basket liner covered in course scatter and sprayed green allowing some of the coir brown colour to show through. The trick  is to pull the coir about for a chaotic appearance whilst keeping the bottom narrower than the top.

Photo 3, Garden

I don't think much of the cottage scene will be visible once the foreground landscape is created so there is no point going overboard on garden detailing.

The ground at the back and front of the cottage is grass flock paper. I placed the vegetable plot, clothes line and apple tree in a line between garage and cottage with the intent of placing a 'portal' into the foreground landscape through which they can be glimpsed.

Garage available to purchase here.





To Part 36.

To Series Part 1.

Friday, 19 August 2016

Project 16 - East Field Part 1

This is the site for East Field, Clark's Lane and Station Cottage. I thought the land would rise above the track bed level, as it does at West Field, but when I checked Crewkerne's station plan again I found that it is lower than the track bed! I don't think it is a massive drop so I am sticking with the small drop here caused by the cork track underlay.

There are three things I want to achieve here. Firstly, a large open field like West Field, secondly a nicely modelled underused lane/bridleway and thirdly lots of trees and shrubs as I have quite a number available from the previous layout. A large open field and lots of trees in this space will be a challenge to maintain balance.

I have two options where to place the cottage, which incidentally does not exist on the prototype, either here with the lane in front of it or, with the cottage back facing us and the lane on the other side. From the viewers position a rear view of the cottage may be more interesting showing a detailed garden and out buildings but the lane would be insignificantly short cutting across the corner. On the prototype the lane ends with a pedestrian level crossing over the main line.

I have decided to position the cottage as shown and run the lane in front of it.


To Part 35.

To Series Part 1.

Saturday, 13 August 2016

Project 16 - Yard Crane

There is no proprietary scale model of this distinctive hand operated 7.5 ton yard crane that once existed at Crewkerne and cranes in the real world exactly like this do not, as far as I am aware, exist today. Photographs in the public domain are also pretty rare and as for a drawing, well I dare say one exists somewhere on the planet.

I had one image that shows a distant view of the crane, enough to recognise its uniqueness but too distant a view to discern details. I made contact with the Friends of Crewkerne Station who very kindly showed me a close up photo that gave much detail of its mechanical arrangements, without which I could not have made the model. But, being only one viewpoint there were hidden aspects. I started another search and came across a preserved yard crane at Bere Ferrers station (a heritage line near Plymouth) that whilst having a different style of frame did have some remarkably similar components and identical operating mechanics.

There are many photographs of the Bere Ferrers crane on the web viewed from all angles and one of these showed the makers plate with the name 'Stothert and Pitt'. There is no doubt in my mind that the two cranes were made by the same firm.

Stother and Pitt were a renowned crane manufacturer located in Bristol. Their first cranes were hand operated and they exhibited one (don't know which style) at the 1851 Great Exhibition. They went on to make travelling railway cranes and huge dockside cranes.

The model design was scaled (4mm:1ft)  from the photos and then scratch built by myself. It may not be 100% dimensional correct and I believe at least one of  the angles is off but it does capture the character of the crane on its dressed stone plinth.

The plinth is card with stone paper overlay and its railings made from copper wire pieces butt glued together using Superglue (very fragile).

Most of the crane components were designed in CAD and 3D printed. Struts, gear axles, winding drum and cable roller support (half way up the jib) were fabricated from various gauges of copper wire.The chains are two pieces of thin brass wire twisted together.

The crane can be hand turned on its central stanchion but the winding mechanics are static. Just as well because I did not bother to model the ratchet locking mechanism!

It was painted grey and the visible cogs and chains painted black. The lot was then given a light dusting with black pastel dust for a weathering effect.

I enjoyed the challenge posed of making this model from scant information, except handling very small parts and loosing many to the carpet abyss caused some frustration.

The back scene in these photos is placed only for the photographic session. I have yet to model the landscape on this part of the layout.

To Part 34.

To Part 1.

Saturday, 6 August 2016

Project 16 - Horse Box

I mentioned previously that Crewkerne Station was noted as a dispatch centre for calves. These were transported in BR Horse Boxes. I needed a rake of these for the new layout. I already had an old Lima Horse Box in Southern Green with 1930s lettering and had the idea to re livery it in BR maroon. What I needed was a reference model to copy.

I have seen photos of different style boxes in use at at Crewkerne, which I assumed to be of LMS (bow side) and GWR (straight side) origin. (The Lima model is based on a GWR design).

On a whim I bought Hornby R6728, a BR Midland box M42367M and latter discovered Hornby once marketed a GWR style box. I found some discontinued stock on eBay and bought  R6561 W643W with the legend 'Calf Box' on the side - very fitting.

On comparing the Lima and Hornby GWR style models I found the bodies of both very similar in levels of detail. Lima has a nice touch of a partially open window but the Hornby chassis has greater detail. One glaring fault on the Lima is the roof vents. There are too many and they are too pointy. It was a simple job to cut off the extra vents and file down the others to match the Hornby box. The Lima model was then given a respray  with Humbrol enamels and HMRS Pressfix decals applied using the Hornby model as a reference.

Next I had to find a correct BR Western number. My research lead me to a document on the web that identified W643W as having been seen at Crewkerne in 1963! I had no idea about this when I bought the Hornby box so was well pleased. The same document identified W676W in use as a calf box in August 1962 so, this was the number chosen for the Lima box.

The refurbished Lima box and the Hornby version sit very well together. If I wanted more I would convert the Limas since second hand Limas are about a quarter the price of a new Hornby.

Left to Right: W676W (Lima conversion), W643W (Hornby), M42367M (Hornby)

To Part 33.
To Part 1.

Friday, 29 July 2016

Project 16 - Down Platform Furniture

On the previous layout I set up a cameo scene based on a photograph of passengers standing on Axminster station near its foot bridge. This required me to fabricate my own human figures to achieve the same costume and pose as in the photograph. The plan was to recreate the scene on the new layout.

I was not too happy with the figures that I made previously because they are a bit over size in height and build so I searched for some proprietary models. I found and bought three of the five figures needed, that were a good match, from the excellent Monty's Models range. I have not found a close match for the other two, a balding middle aged man and a middle aged woman in a summer dress.

It was at this point that I moved the foot bridge to its correct position near the road bridge completely destroying the cameo scene! But the figures are so good I decided to leave them in their original place. The girl in the pink dress has been modified by giving her a head scarf made from kitchen foil.

The palisade fence in the above photograph is Ratio GWR spear fencing with the diamond points cut off. Not quite enough in the packet to complete the job so I designed and 3D printed the extra panels to good effect. Had I known the fine detail would print OK I would have printed the lot.

Moving along the platform the waiting shelter was scratch built in the 1980s from hardboard and card. Next to it is a rack of fire buckets.

Beyond the road bridge is a water crane, station name board, swan neck lamp, noticeboard and the co-acting signal described in an earlier posting. An LSWR style bench is needed to complete this scene.














To Part 32.

To Part 1.

Saturday, 23 July 2016

Project 16 - Station Throat

One for those who like a lot of track. This is as busy as it gets at Misterton.

From left to right, down headshunt, down main line, up main line, up siding, goods shed siding, crane siding.

Ballasting and grassing has started as progress moves beyond the east end of the station into open country. Sidings were spaced further apart from the main lines hence the grassed no-mans land between them.


To Part 31

To Part 1.

Saturday, 16 July 2016

Project 16 - Down Siding Landscape

On the east side of the cattle dock at Crewkerne was a coal office but the coal stacks were on the other side of an adjacent siding. Here on the model we are right at the front edge of the layout so the coal siding and coal stacks are off stage.

Just to highlight that there was coaling activity near here a sprinkling of coal dust has been applied to the yard.

The office itself is a very old Airfix kit, which is a bit crude by todays standards. Nevertheless, it is still available under the Dapol brand.

On the west side of the cattle dock was a hut (purpose unknown) and this too is an Airfix kit. In this photo the ramp up to the loading platform is seen.

The embankment was made in the same manner as West Field, except wood filler used on the car park was applied instead of plaster of Paris to cover the foam.

Friday, 8 July 2016

Project 16 - Cattle Dock

The cattle dock at Crewkerne had a brick platform, unlike the stone block station platforms. Three pens were provided and an unfenced loading platform alongside.

I have three different area plans and an aerial view of the station and yet none of them clearly show how the livestock gained access to the pens from the road side. Two plans show a ramp to the unfenced loading platform alongside but no access gates were provided from there.  There was one access gate located at the back of the rearmost pen. This gate must be the entrance for livestock but the plans do not show a ramp to it or much space to manoeuvre livestock lorries. None of this matters from a modelling aspect because the rear half of the dock is 'off stage', as shown right!

The platform  is made in the same way as the station platforms, being a plank of wood 18mm thick covered in granite dust on a dark grey painted base.

The fences at Crewkerne were board on concrete posts. For the model they are 3D printed, but matchsticks and card would be just as good and simpler to make.

The gates are fitted with paper hinges so that they can be opened and closed. Paper hinges are not robust enough to withstand prolonged use but they will only be moved for the occasional photographic session.

The gates are also fitted with working latches made from thin copper wire.

The final photo shows the loading gates open with a cow about to enter a wagon. However, Crewkerne was more noted as a dispatch centre for male calves destined for Scotland where they were processed into veal. I would like to show a pen of 6 month old veal calves but 00 gauge calves are not available in large packs. Best we can get is a pack of cows that include 1 or 2 calves. N gauge cows are too small to represent 6 month old 00 gauge calves but TT cows (Noch or Preiser) are close enough in height but carry too much weight for calves. The pens willl have to remain empty until I solve this problem. A couple of water troughs are also needed to complete the pens.


To Part 29
 
To Part 1.

Sunday, 3 July 2016

Project 16 - 6 Month Review


Having spent most of my working life planning and managing development projects I have been conditioned to set and work towards milestones. Hobby activities are no exception. I started Project 16 - Misterton Rebuild at the beginning of 2016 and set myself the goal to complete the layout within a year. By complete I mean an operational and fully scenic layout. There is usually ongoing little additions and changes that occur afterwards. Most of the track work is operational and about half the layout landscaped so I can safely say that I am on target.

If I had to choose the most significant advances in the past 6 months it would be Track Work and West Field. Track work because I opted to design and 3D print my own sleepers with integrated chairs for the straight track (turnouts are Peco by the way). Consequently track laying was a major task that took some considerable time but it looks authentic and running trains is smooth and trouble free. The other significant advance was the creation of West Field simply because it has made such a big visual statement on the layout and is completely new whereas some scenic elements, especially most buildings,  have been reused from the previous layout.

Major works to carry out in the next six months are to build a cattle dock and finish its siding; create East Field, Clark's Lane and reinstate Railway Cottage; create Crewkerne Tunnel Portal and embankments and I'm toying with the idea of scratch building Crewkerne's 7.5 ton yard crane.

The scene on the model railway shown above was staged from a photograph of a passenger train at Crewkerne Station. Sky and steam effect have been added. You'll have to take my word that the likeness to the prototype is remarkable.

The model station building was made in the late 1970s. (About 40 years old now!)

To Part 28.

To Part 1.

Thursday, 23 June 2016

Project 16 - More Roding, Ballast & A Water Crane

I mentioned previously how fiddly the Colin Waite brass etch point roding roller frames were to assemble so, I was not  excited about continuing the work. Nevertheless I must have been in a good frame of mind (excuse the pun) because I quite enjoyed it this time, almost therapeutic. A warm summer evening with only bird song breaking the silence may have helped.

I have not studied the technicalities of real world point roding installation in any great detail and have not, for example, included expansion cranks for the rods. My aim is only to give an impression of  track side fittings. I am now well over the peak of laying the rods with just two runs left to install for the exit turnouts of the up and down sidings.

Ballasting has been applied to the 3 way turnout and single slip on the mainline and a water crane planted next to the barrow crossing. I have seen no evidence of water cranes in use at Crewkerne, certainly not in the 1960s but, there was a water tower at the station albeit without a tank in this period. Having reinstated the tank on the model it seemed logical to fit water cranes.

To Part 27


To Part 1.

Thursday, 16 June 2016

Project 16 - Up Platform Furniture

Starting at the east end of the platform we have mother and children (Airfix). The girl with her teddy bear keen to hang onto mum's hand and the boy more aloof transfixed on engine workings.

On the platform ramp is a notice board instructing passengers to cross via the bridge.

The Southern barley twist lamp comprises lamp and plinth cut from Airfix station lamp posts, the barley twist post is twisted wire and the swan neck lamp holder is copper wire.


To the side of the signal cabin is a rack of red fire buckets (not seen in photos here).

Moving along we have a group of figures. The Station Master looking at his pocket watch (because the next train is late) comes from the Modelu range. A truly life like pose, as are all from this range, that is due to them being 3D printed from a 360 degree scan of a real person, (from the Severn Valley Railway I believe).

Almost as good is the Porter (Peco) whereas the sitting public look stuffed (Airfix woman and Peco man) or are they sunning themselves on this hot summer day?

The seat is made from copper wire and is a a copy of the one at Crewkerne in this position in the 1960s.

The next photo shows that I have moved the footbridge from its previous location next to the signal cabin to beside the bridge. It has resulted in quite a busy scene but completely authentic as this is where it was placed at Crewkerne. My footbridge style is different, being based on Axminster. The main reason I moved it here though  is because next to the signal box it obscured the signalman's view along the track!

Regrettably this move has destroyed a little cameo scene I had set up from real life, of which more when I present the down platform furniture.

The man (Airfix) is about to open the door to enter the lavatory.

Finally, at the far west end of the platform hidden from view on the other side of the road bridge are the lovers (Peco) on a LSWR style bench made from copper wire.

Next is the station name board (matchsticks and card) and another lamp post.

I just realised I need to make another notice board for this end of the platform instructing passengers to cross via the footbridge. I also need to obtain more luggage barrows.


To Part 26.

To Part 1.

Thursday, 9 June 2016

Project 16 - Station Master's Garden

All except the grass and soil are reclaimed from the previous build.I may as well repeat the details that I first posted in 2011.

" Next a spot of gardening. There is no better material to represent nature than nature itself. That is not to say it is the only material I use, far from it. But, wherever possible I use real flora - end of season, dead, stiff and brown. "

" We have two rows of carnations grown for decorating the waiting room and to provide button holes for staff. 1960s is probably a bit late for this kind of touch but I like the thought. The stems are dead pine needles split down the middle, grouped, dabbed into PVA glue and placed in position. Aquilegia seeds are applied as flower heads - any seed will do and to be honest I'm not convinced it is necessary. Anyway, place a blob of PVA in your palm, sprinkle on the seeds, mix up well with a finger and wipe the finger along the top of the pine needles to deposit the seeds in a random fashion. When dry paint appropriately. "

" Next we have the obligatory cabbages and runner beans that most model railways seem to have. The cabbages are the base of spent aquilegia seed pods that even have a stem and heart! The runner bean poles are painted galvanised wire with Woodland Scenic flock glued to them to represent runner beans. "

" The shrubs next to the fence are very small clumps of lichen with a little Woodland Scenics flock covering."

" This is the view from the back door. Two concrete pillars in the lawn hold a washing line and a long pole props the line high to keep washing off the ground. The grass is flock paper. The small tree is made from yarrow. Its seed pod 'leaves' have been supplemented with a small amount of Woodland Scenics mat spread over. "  




To Part 25.

To Part 1.
Related Posts Plugin for WordPress, Blogger...