Friday, 5 June 2020

Project 20 - 0 Gauge Layout - Part 19

Back in December 2019 I bought a loco crew from the Guildford Gauge 0 guild trade show held in Reading, Berkshire for my Terrier locomotive . After sitting on the shelf for five months I was finally in the right frame of mind to paint them up and fit them to the loco.

They are from the Phoenix 43 Scale Miniatures range available from S and D Models. The guy on the left is supplied with separate head and arms and the guy on the right with separate head and shovel. Not sure why because there is only one suitable pose to apply.

The guy on the left was sold to me as a Driver but having assembled him he has a rather odd pose for a driver, don't you think.


Considering these are not 3D printed (noted for high definition) the definition is remarkable good with individual fingers clearly defined and well detailed facial features. They are moulded in pewter.


To Part 1.  


Wednesday, 27 May 2020

Project 20 - 0 Gauge Layout - Part 18

The second fiddle yard. This one is for the mill end of the layout. For build details see the first fiddle yard posting.

This fiddle yard is not strictly necessary to operate the layout. Access to the sidings is always from the fiddle yard at the other end.

This fiddle yard is only required if trains are to be run along the length of the branch line. However, it also offers the opportunity to drive trains on/off the layout to/from the siding that runs under the mill overhead walkway, thereby enhancing shunting operations.

To Part 19.

To Part 1.   

Wednesday, 20 May 2020

Project 20 - 0 Gauge Layout - Part 17B


The name of the mill is Hillson Paper Mills, which is an anagram of the prototype Hollins Paper Mills.

The walkway is made from 3D printed corrugated panels glued to card walls.






The sawtooth roof of the building is also 3D printed as individual panels glued to rafters.

The roof and 1st and 2nd floors are removeable in case I want to upgrade with lighting for each floor or change the machinery inside.

The second floor is a wallpaper design office, cuurently void of furniture and staff.



View from the brach line with chlorine tanker alongside.

Sidings either side of the building should be further from the building (it's the main compromises of 0 gauge to fit everything in on a small layout). Somehow, I did not test my Class 33 when setting the track distance from the building. On the left siding the hand rails that protrude from the 33 cab side hit the building corner and on the right siding, which is on a curve, the central body of the 33 hits the building wall. I had two options; remake the building to reduce its width or move the tracks, which are embedded in solid DAS clay.

The building took several weeks to make so I was not going there. Surprisingly, it was not too difficult to free the rails from the DAS clay. I used a chisel to gouge out grooves in the DAS clay and then broke the superglue joins of the live and guide rails with scalpel.

To Part 18.