About Comments

Comments are enabled on all postings. Click a posting to find the comment box. Comments are moderated and appear after my review.

Sunday, 3 July 2016

Project 16 - 6 Month Review


Having spent most of my working life planning and managing development projects I have been conditioned to set and work towards milestones. Hobby activities are no exception. I started Project 16 - Misterton Rebuild at the beginning of 2016 and set myself the goal to complete the layout within a year. By complete I mean an operational and fully scenic layout. There is usually ongoing little additions and changes that occur afterwards. Most of the track work is operational and about half the layout landscaped so I can safely say that I am on target.

If I had to choose the most significant advances in the past 6 months it would be Track Work and West Field. Track work because I opted to design and 3D print my own sleepers with integrated chairs for the straight track (turnouts are Peco by the way). Consequently track laying was a major task that took some considerable time but it looks authentic and running trains is smooth and trouble free. The other significant advance was the creation of West Field simply because it has made such a big visual statement on the layout and is completely new whereas some scenic elements, especially most buildings,  have been reused from the previous layout.

Major works to carry out in the next six months are to build a cattle dock and finish its siding; create East Field, Clark's Lane and reinstate Railway Cottage; create Crewkerne Tunnel Portal and embankments and I'm toying with the idea of scratch building Crewkerne's 7.5 ton yard crane.

The scene on the model railway shown above was staged from a photograph of a passenger train at Crewkerne Station. Sky and steam effect have been added. You'll have to take my word that the likeness to the prototype is remarkable.

The model station building was made in the late 1970s. (About 40 years old now!)

To Part 28.

To Part 1.

Thursday, 23 June 2016

Project 16 - More Roding, Ballast & A Water Crane

I mentioned previously how fiddly the Colin Waite brass etch point roding roller frames were to assemble so, I was not  excited about continuing the work. Nevertheless I must have been in a good frame of mind (excuse the pun) because I quite enjoyed it this time, almost therapeutic. A warm summer evening with only bird song breaking the silence may have helped.

I have not studied the technicalities of real world point roding installation in any great detail and have not, for example, included expansion cranks for the rods. My aim is only to give an impression of  track side fittings. I am now well over the peak of laying the rods with just two runs left to install for the exit turnouts of the up and down sidings.

Ballasting has been applied to the 3 way turnout and single slip on the mainline and a water crane planted next to the barrow crossing. I have seen no evidence of water cranes in use at Crewkerne, certainly not in the 1960s but, there was a water tower at the station albeit without a tank in this period. Having reinstated the tank on the model it seemed logical to fit water cranes.

To Part 27


To Part 1.

Thursday, 16 June 2016

Project 16 - Up Platform Furniture

Starting at the east end of the platform we have mother and children (Airfix). The girl with her teddy bear keen to hang onto mum's hand and the boy more aloof transfixed on engine workings.

On the platform ramp is a notice board instructing passengers to cross via the bridge.

The Southern barley twist lamp comprises lamp and plinth cut from Airfix station lamp posts, the barley twist post is twisted wire and the swan neck lamp holder is copper wire.


To the side of the signal cabin is a rack of red fire buckets (not seen in photos here).

Moving along we have a group of figures. The Station Master looking at his pocket watch (because the next train is late) comes from the Modelu range. A truly life like pose, as are all from this range, that is due to them being 3D printed from a 360 degree scan of a real person, (from the Severn Valley Railway I believe).

Almost as good is the Porter (Peco) whereas the sitting public look stuffed (Airfix woman and Peco man) or are they sunning themselves on this hot summer day?

The seat is made from copper wire and is a a copy of the one at Crewkerne in this position in the 1960s.

The next photo shows that I have moved the footbridge from its previous location next to the signal cabin to beside the bridge. It has resulted in quite a busy scene but completely authentic as this is where it was placed at Crewkerne. My footbridge style is different, being based on Axminster. The main reason I moved it here though  is because next to the signal box it obscured the signalman's view along the track!

Regrettably this move has destroyed a little cameo scene I had set up from real life, of which more when I present the down platform furniture.

The man (Airfix) is about to open the door to enter the lavatory.

Finally, at the far west end of the platform hidden from view on the other side of the road bridge are the lovers (Peco) on a LSWR style bench made from copper wire.

Next is the station name board (matchsticks and card) and another lamp post.

I just realised I need to make another notice board for this end of the platform instructing passengers to cross via the footbridge. I also need to obtain more luggage barrows.


To Part 26.

To Part 1.
Related Posts Plugin for WordPress, Blogger...