About Comments

Comments are enabled on all postings. Click a posting to find the comment box. Comments are moderated and appear after my review.
Showing posts with label atlantic coast express. Show all posts
Showing posts with label atlantic coast express. Show all posts

Friday, 8 April 2011

ACE Reporting Number

This came about after I watched Jim Clemens 'The Withered Arm' for the fourth time. The narrator (his son Michael) made the briefest of comments that the ACE loco in view was showing the number 6, the reporting number allocated to the 'down' ACE. His comment from earlier viewings did not register with me so armed with this new information, well new to me, I browsed my railway books that I have scoured many times before and there in the ACE photos was the number 6, which had also previously escaped me. On another photo I discovered the 'up' ACE used the reporting number 7.

Now, I knew about reporting numbers, (They were read by signallers in particular to identify a specific train service and route the train correctly, mostly used on busy or congested routes) but I had not considered their use on the ACE, which with its massive name board could not be easily mistaken.

The number for the model was printed on a sticky label using 'Arial Narrow' font size 8, a close approximation to the prototype.

Wednesday, 19 May 2010

Bulleid Restaurant/Buffet Build - Part 1 (Here we go!)

This is the Comet Models kit I'm assembling. It is an expensive but well designed and engineered kit. Assembly is not for the feint hearted. You need excellent eyesight (or in my case a magnifying glass) and manual dexterity in addition to appropriate tools. 

For the period modeller it is imperative that photographs and articles are available to check against. In particular, I found the very detailed scale drawings of the prototype in MRC Nov 1980 very helpful to correct at least one inaccuracy in the manufacturers instructions, i.e. battery box position. Or, did MRC get it wrong? 

None of the prototypes survived into preservation so there is not one to see in reality. The supplied instructions are quite good except the solebar assembly drawing is confusing causing me to fit them the wrong way around! Fortunately it is a soldered section so just sweating the joints enabled disassembly without damage. With the solebars fitted correctly the bogies then interfered with them, which was easily remedied by standing them off with extra small plates soldered to the chassis where they pivot. 

It is a heavy beast, being all metal construction, as heavy as a locomotive. It would be lighter for the pulling locomotive if the whitemetal components were manufactured as plastic mouldings. The roof, body, chassis and bogies will be disassembled for painting individually. But first, I'll build the kitchen/buffet coach for this two coach set used on the 'Atlantic Coast Express'. Oh, by the way, about 3 days solid work to get this far in the assembly.




Saturday, 20 June 2009

1960s Atlantic Coast Express (ACE) Summer Train Formation

The ACE departed Waterloo at 11am until the final run of this named train on September 5th 1964. Whilst the destination of the engine was Exeter coaches ended their journey at either Ilfracombe, Plymouth, Torrington, Padstow, Bude, Sidmouth, Exmouth, Exeter or Seaton (the Seaton coach was discontinued after 1957) . The east Devon and Exeter coaches were taken off at Salisbury to continue the journey behind a Salisbury engine. In summer, coaches were split between the 11 am and an extra 11.05am service, e.g. for Plymouth, Padstow and Bude.

The composition of the ACE was complex and varied depending on the time of year and passenger demand for the service. My interest is the early 1960s and the train as it would have been seen running through Somerset to and from the west.

A representative makeup of the down 11.am ACE .
14th July 1962 as shown in 'Portrait of the Atlantic Coast Express' by Stephen Austen:

Acceptable coaches are Bullied 63' or BR MK1 or a mixture of both for later years .

1. Merchant Navy class engine
2. Brake (BSK) - Ilfracombe
3. Composite Corridor (CK) - Ilfracombe
4. Brake (BSK) - Ilfracombe
5. Brake Composite Corridor (BCK) - Torrington
6. Restaurant 2nd (RS)
7. Kitchen Buffet (KB)
8. Brake Composite Corridor (BCK) - Padstow
9. Brake Composite Corridor (BCK) - Bude
10. Brake Composite Corridor (BCK) - Plymouth
11. Brake Composite Corridor (BCK) - Exmouth (Detached at Salisbury)
12. Brake Composite Corridor (BCK) - Sidmouth (Detached at Salisbury)
13. Brake Composite Corridor (BCK) - Exeter (Detached at Salisbury)

Up ACE departing Exeter Central 12.30pm.

1. Merchant Navy class engine
2. Brake Composite Corridor (BCK) - Padstow
3. Brake Composite Corridor (BCK) - Bude
4. Brake Composite Corridor (BCK) - Plymouth
5. Restaurant 2nd (RS)
6. Kitchen Buffet (KB)
7. Brake (BSK) - Ilfracombe
8. Composite Corridor (CK) - Ilfracombe
9. Brake (BSK) - Ilfracombe
10. Brake Composite Corridor (BCK) - Torrington
11. Brake Composite Corridor (BCK) - Exmouth
12. Brake Composite Corridor (BCK) - Sidmouth

00 gauge (4mm scale) Model Sources:

Merchant Navy Class Engine - Hornby
MK1 Brake (BSK) - Bachmann, Lima
MK1 Composite Corridor - Bachmann, Lima
Restaurant - Bachmann, Lima
Buffet MK1 - Hornby, Bachmann
MK1 Brake Composite Corridor (BCK) - Bachmann, Lima
Bullied 63' composite corridor and 2nd Brake Corridor/Open - Bachmann

No one produces a RTR (ready to run) Bullied BCK* but the Bachmann 2nd Brake Corridor/Open is a close match and could be converted by applying the yellow 1st Class banding above the two windows nearest the guard/luggage area - post 1963 era, or a yellow 1 (one) on the coach door - before 1963, which is also relavant post 1963.

*Postscript: Partial Self Assembly Mk 1 BCK  is available from Replica Railways.
Related Posts Plugin for WordPress, Blogger...