This is the last posting in this series.
Research, Design and Build of the layout was achieved over about six months during 2024.
Key chapter links are listed below:
Chapter 2: Flyover bridge design and build (3D print)
Chapter 9: Thoughts on layout design
Chapter 11: Layout Build
Chapter 25: Photo Shoot
Click the 'To Series Part 1' link below to follow the project from the beginning.
THE MOVIE